| Picture |
Customer |
Location |
Task Description |
 |
Agrana |
Austria, Pischelsdorf |
Agrana bioethanoltanks
1 piece mash-mix-tank ø3,6m, H=8m, material:P235GH
2 piece caustic-storage-tank ø3,5m, H=6,6m, material: P265GH
1 piece sulfuric-acid-tank ø3,0m, H=4,0m, material: P235GH
1 piece fuseloil-decantig-centrifuges ø3,3m, H=2,0m,
material: 1.4301
Engineering / Manufacturing / Assembling |
 |
AKR- Modulgas GesmbH |
Austria,
Hollern
Lichtenwörth |
biogasplant - BV Hollern (500kW)
biogasplant BV Lichtenwörth (500kW)
piping of natural gas- and transportpipes, heatingsystem and equipment assembling
(material: 1.4301, 1.4571; PE; P235TR1)
Assembling |


|
Andritz AG |
Voreppe, France
Sloakia, Ljubljana
Austria,
Eferding
|
muddrying plant:
40 to steel construction, piping and insolation
Engineering / Manufacturing / Assembling
muddrying plant:
42 to steel construction
Engineering / Manufacturing / Assembling
muddrying plant:
80 to steel construction
assembling of pipes and equipment
Engineering / Manufacturing / Assembling
|
| |
ATG |
Austria |
laying of district heating pipes DN 20 - DN 250
~ 30 km pipepath/year
district heating Schladming
~ 10 km pipepath DN20-DN200 laying of pipe and long-distance line
district heating Oberpullendorf
~ 5 km pipepath DN150 laying of pipe and long-distance line within insolation and long-distance leading system, boiler house installation
district heating Oberwart
~ 5 km pipepath DN150 and DN200 laying of pipe and long-distance line within insolation and long-distance leading system, boiler house installation, pipeing of transferstation and heatexchanger
district heating Aspang
~ 8 km pipepath DN20-DN150 laying of pipe and long-distance line within insolation and long-distance leading system, boiler house installation
district heating Laßnitzhöhe
~ 9 km pipepath DN20 - DN150 laying of pipe and long-distance line within insolation and long-distance leading system, boiler house installation
district heating Bad Kleinkirchheim
~ 15 km pipepath Dn20-DN150 laying of pipe and long-distance line within insolation and long-distance leading system, boiler house installation, pipeing of transferstation Assembling |


|
Austrian Energy & Environment |
Austria, Arnoldstein |
waste incineration plant:
detailengineering, material supplying, manufacturing and assembling of
200 t steel construction, handrails, stages and landings
50 t pipeline bridge constructions
21 t exhaused gas pipes DN500-DN1000 (stainless steel)
110 t activated coke absorber
40 t SCR plant
30 t mechanical haulage systems
35 t piping DN15 to DN300 carbon- and stainless steel
120 t equipment assembling
Engineering / Manufacturing / Assembling
|
 |
AVE Regau |
Austria, Regau |
exhaust gas pipes:
manufacturing and assaembling of pipes and supports (stainless steel)
~150 to steelstrukture
1000 m piping DN100 - DN1400
Engineering / Manufacturing / Assembling
reconstruction gas reducing station
Assembling |
 |
AVN Dürnrohr |
Austria, Dürnrohr |
waste incineration plant:
steel construction and insolation
110 t steel structure
1.600 m2 insolation
25 t mounting constructions
Engineering / Manufacturing / Assembling
annual audit Block I und II inclusive Engineering and coordination
Engineering / Assembling
pipeing and tanks
Assembling
reconstruction electrostatic filter plant
Assembling
catalytic converter retrofit
Assembling
|
| |
Babcock Borsig
Power Environment GmbH |
Turkey,
Iskenderun |
2500 to electrostatic filter
Engineering / Manufacturing
|
 |
Begas |
Austria, Burgenland |
1200 lfm. steam duct DN350
Static, pipe engineering, steel structure and insolation
Engineering / Manufacturing / Assembling |
| |
Caliqua AG |
Austria,
Wels
Switzerland |
WAV II turbine pipeing for waste incineration plant:
~ 4,6 km DN25 - DN600 live steam pipes to cooling water pipes and equipment assembling
material: 1.4301, S235JR, P235GHTC1, -TC2, 16Mo3
Assembling
4800 m hot water pipe DN350 inclusive reating and assembling of supportingconcept
Engineering / Assembling |
 |
CTU |
Austria,
Güssing |
biomassplant
46 to steel construction inclusive detailengineering assembling of piping, supporting concept and insolation
Engineering / Manufacturing / Assembling |
 |
Ebner, Eiterfeld |
Austria, Ebensee
Austria, Ebensee
Germany, Töging |
mother liquor plant
430 to steel construction(dimension: H 26 m, B 20 m, L 50 m)
Engineering / Manufacturing / Assembling
mother liquor tank
ø 6120 mm, H = 7500 mm, material: 1.4571
Manufacturing / Assembling
vapor piping
~ 100 m pipes DN200 - DN600, material: 1.4539, 1.4541
Manufacturing / Assembling
|
| |
Energie AG |
Austria, Riedersbach |
high pressure wastewater sludge pipes DN150 PN100
Engineering / Assembling |
 |
EVN AG |
Austria, Pöchlarn
Austria, Dürnrohr
Austria,Dürnrohr
|
natural gas high pressure pipe DN200 PN70
Assembling
annual audit Kraftwerk Dürnrohr
Assembling
redevelopment electrostatic filter (fild 2 and 3)
Engineering / Manufacturing / Assembling |
| |
E-Werk Reutte |
Austria,
Vils-Reutte |
ca. 15 km high pressure gas pipe DN200
ca. 15 km pipe laying (material: PE DA 225 bis DA 25)
150x houseconection
Engineering / Assembling |
| |
Fernwärme Wien
bay houseplants |
Austria,
Wien |
warn water transferstations (until 400 kW)
heating transferstations
primary transferstations (until 2 x 1400 kW)
(about 30 to 40 stations per year)
Manufacturing / Assembling |
| |
Fisia Babcock |
Germany,
Mannheim, Oberhausen |
1000 to electrostatic filter Mannheim
250 to electrostatic filter Oberhausen
Engineering / Manufacturing |
 |
Gerstl |
Austria,
Wels |
connection bridge Fachhochschule - BFI
20x2,5x3,5m (LxBxH)
additional about 27to steel construction (for soundproofing and elevators)
Engineering / Manufacturing / Assembling |
| |
GSD
Gesellschaft für Stadt-
und Dorferneuerung |
Austria,
Wien |
elevator retrofit in buildings (city vienna)
Engineering / Manufacturing / Assembling |
| |
Kanzler
Verfahrenstechnik |
Tunis |
seewater-desalination
150 to steel construction
Engineering |
 |
Lafarge Perlmooser AG |
Austria,
Retznei
Austria,
Mannersdorf |
annual audit
Assembling
dissolvent plant
about 20 to steel structure
about 1000 m pipeing DN15-DN100
(material 1.4301, 1.4571, S235JR)
Manufacturing / Assembling
clinker cooler assembling
about 15 to substructure
assembling of clinker cooler (weight about 150 to)
Manufacturing / Assembling
annual audit
Assembling
assembling of hot gas duct
ø 2500 mm, Material 1.4301
Assembling
cement tank
~ 10 to ø 4200 mm, H=16 m
Engineering / Manufacturing / Assembling
|
 |
Lenzing Lyocell GmbH & Co KG |
Austria, Heiligenkreuz |
Linie 2
10x pressure vessel ø 1000 - 6000mm (material: 1.4571)
Engineering / Manufacturing / Assembling
8x bursting vessel (ø900mm, L=2800mm)
Engineering / Manufacturing / Assembling |
 |
MCE Energietechnik |
England |
biodieselfuel plant Teeside 1
precast of the plant in containerdesign (about 40 containers = about 120 to) inclusive piping (about 2900m) and equipment assembling
Manufacturing / Assembling
|
 |
Oestu Stettin |
Austria,
Wien |
terrorprotection
3 pieces height limiting to protect the building of the UNO
Engineering / Manufacturing / Assembling |
 |
Rote Mühle Deutschland |
Iran |
air preheater rotor
50 to steel construction, material: COR-TEN B (S355J2G1W)
Manufacturing
|
 |
Rudolf |
Austria,
Purkersdorf |
redevelopment of a historical platformroof
~ 100 to steel construction disassembling; redevelopment and partial substitution with new parts;
assembling
Manufacturing / Assembling |
 |
Salzburg AG |
Austria,
Bruck-Kaprun
Gasteiner Tal
Austria, Trumersee
|
gas-medium pressure duct
Assembling
1800 m gaspipe DN300 PN 70
installed under way in the Trummer sea
Assembling |
 |
Tiroler Ferngas GmbH |
Austria,
Tirol |
natural gas supply
medium pressure pipe (material carbon steel)
low pressure pipe (material: PP)
Assembling |



|
voestalpine Donawitz |
Austria,
Donawitz |
high crane rail - free storage rail 3+4
120 to steel construction (assembling in two weeks)
Engineering / Manufacturing / Assembling
EG3 - blast furnace air-supply
steel construction, pipes (DN15 to DN1400) and a lot of dwelling work
Engineering / Manufacturing / Assembling
2 Stk. pressure vessel (waterconcept 20K)
ø 3500mm, L=8m, thickness to 15mm,
material: P265GH
Engineering / Manufacturing / Assembling
pipeing BG5000 (waterconcept 20K)
(DN25 - DN1400, Material: P235TR1, S355J2G3)
Engineering / Manufacturing / Assembling |


|
VAI Voest Alpine Industrieanlagenbau GmbH |
Austria,
Donawitz
Germany, Dillingen
Slowika
Austria
Russia/Alchevsk
Brasil/Rio de Janeiro
|
84 to piping mediapackage of panoven incl. subsurface piping
23 to plant piping (powerplant reconstruction)
8000 m pipes DN15 to DN400
(material: carbon- and stainless steel)
Engineering / Manufacturing / Assembling
piping extrusion casting plant Line3 / Line 4
20.000 m pipes and equipment
Engineering / Assembling
2 piece cooler tank - VDK
ø 4500mm, height 20m,
58 to/piece, material: 16Mo3 and P265GH
Engineering / Manufacturing
125 to cooling package (sheet metall 3mm Mo3, length 12m)
65 to steel construction and stairtower
Manufacturing
flareheads
~ 130 to manufacturing and creation of assembling drawings
material: P265GH, 1.4828
Manufacturing |
| |
VA-Tech Hydro |
Schwizerland
Cleuson-
Dixence |
5 to support construction
for pressurepipe ø 2688mm, material: S355J2G3, S355JR
Manufacturing |
 |
Waagner Biro Brückenbau AG |
Äthiopia
Austria,
Wien |
Panelbridge:
200 to steel construction
Manufacturing
truck-turn-bridge (Columbus-Center Vienna)
35 to steel construction
Manufacturing / Assembling |
 |
Weinkellerei Wegenstein |
Austria |
pallet-delivery-bridge
45 to steel construction incl. piping of filling machine
Engineering / Manufacturing / Assembling |


|
Wiener Linien |
Austria,
Wien |
subwaystation: U1-Station, Taubstummengasse, Praterstern
steel construction for elevators, facing- and interior work
Engineering / Manufacturing / Assembling
subwaystation: "U1-Leopoldau"
complete interior work:
12.000 m² facade facing made of sound-protection-panelen,
Emailpanel, Alupanel
720 m² glas-steel-facade
300 to steel consupstruction
Engineering / Manufacturing / Assembling |