The following excerpt from our extensive customer reference list is to emphasize the variety of our engineering, manufacturing and assembly activities, which were furnished not only at the Austrian, but also at the international market.

In all projects we showed ourselves as competent and reliable supplier for stealing and GRP components in the building of industrial plants as well as piping construction.

     
 
Picture Customer Location Task Description
Agrana Austria, Pischelsdorf

Agrana bioethanoltanks
1 piece mash-mix-tank ø3,6m, H=8m, material:P235GH
2 piece caustic-storage-tank ø3,5m, H=6,6m, material: P265GH
1 piece sulfuric-acid-tank ø3,0m, H=4,0m, material: P235GH
1 piece fuseloil-decantig-centrifuges ø3,3m, H=2,0m,
            material: 1.4301

Engineering / Manufacturing / Assembling

AKR- Modulgas GesmbH

Austria,
Hollern
Lichtenwörth

biogasplant - BV Hollern (500kW)
biogasplant BV Lichtenwörth (500kW)


piping of natural gas- and transportpipes, heatingsystem and equipment assembling (material: 1.4301, 1.4571; PE; P235TR1)

Assembling

Andritz AG

Voreppe, France




Sloakia, Ljubljana




Austria, Eferding

muddrying plant:
40 to steel construction, piping and insolation

Engineering / Manufacturing / Assembling

muddrying plant:
42 to steel construction

Engineering / Manufacturing / Assembling

muddrying plant:
80 to steel construction
         assembling of pipes and equipment

Engineering / Manufacturing / Assembling

  ATG Austria

laying of district heating pipes DN 20 - DN 250
~ 30 km pipepath/year

district heating Schladming
~ 10 km pipepath DN20-DN200 laying of pipe and long-distance line

district heating Oberpullendorf
~ 5 km pipepath DN150 laying of pipe and long-distance line within insolation and long-distance leading system, boiler house installation

district heating Oberwart
~ 5 km pipepath DN150 and DN200 laying of pipe and long-distance line within insolation and long-distance leading system, boiler house installation, pipeing of transferstation and heatexchanger

district heating Aspang
~ 8 km pipepath DN20-DN150 laying of pipe and long-distance line within insolation and long-distance leading system, boiler house installation

district heating Laßnitzhöhe
~ 9 km pipepath DN20 - DN150 laying of pipe and long-distance line within insolation and long-distance leading system, boiler house installation

district heating Bad Kleinkirchheim
~ 15 km pipepath Dn20-DN150 laying of pipe and long-distance line within insolation and long-distance leading system, boiler house installation, pipeing of transferstation

Assembling

Austrian Energy & Environment Austria, Arnoldstein

waste incineration plant:
detailengineering, material supplying, manufacturing and assembling of

200 t steel construction, handrails, stages and landings
  50 t pipeline bridge constructions
  21 t exhaused gas pipes DN500-DN1000 (stainless steel)
110 t activated coke absorber
  40 t SCR plant
  30 t mechanical haulage systems
  35 t piping DN15 to DN300 carbon- and stainless steel
120 t equipment assembling

Engineering / Manufacturing / Assembling

AVE Regau Austria, Regau

exhaust gas pipes:
manufacturing and assaembling of pipes and supports (stainless steel)
~150 to steelstrukture
1000 m  piping DN100 - DN1400

Engineering / Manufacturing / Assembling


reconstruction gas reducing station

Assembling

AVN Dürnrohr Austria, Dürnrohr

waste incineration plant:
steel construction and insolation

110 t       steel structure
1.600 m2 insolation
25 t          mounting constructions

Engineering / Manufacturing / Assembling

annual audit Block I und II inclusive Engineering and coordination

Engineering / Assembling

pipeing and tanks
Assembling

reconstruction electrostatic filter plant

Assembling

catalytic converter retrofit
Assembling

 

Babcock Borsig
Power Environment GmbH

Turkey, Iskenderun

2500 to electrostatic filter

Engineering / Manufacturing

Begas

Austria, Burgenland

1200 lfm. steam duct DN350
Static, pipe engineering, steel structure and insolation

Engineering / Manufacturing / Assembling

  Caliqua AG Austria, Wels






Switzerland

WAV II turbine pipeing for waste incineration plant:
~ 4,6 km DN25 - DN600 live steam pipes to cooling water pipes and equipment assembling
material: 1.4301, S235JR, P235GHTC1, -TC2, 16Mo3

Assembling

4800 m hot water pipe DN350 inclusive reating and assembling of supportingconcept

Engineering / Assembling

CTU Austria,
Güssing

biomassplant
46 to steel construction inclusive detailengineering assembling of piping, supporting concept and insolation

Engineering / Manufacturing / Assembling

Ebner, Eiterfeld

Austria, Ebensee




Austria, Ebensee




Germany, Töging

mother liquor plant
430 to steel construction(dimension: H 26 m, B 20 m, L 50 m)

Engineering / Manufacturing / Assembling

mother liquor tank
ø 6120 mm, H = 7500 mm, material: 1.4571

Manufacturing / Assembling

vapor piping
~ 100 m pipes DN200 - DN600, material: 1.4539, 1.4541

Manufacturing / Assembling

  Energie AG Austria, Riedersbach high pressure wastewater sludge pipes DN150 PN100

Engineering / Assembling
EVN AG

Austria, Pöchlarn



Austria, Dürnrohr



Austria,Dürnrohr

natural gas high pressure pipe DN200 PN70

Assembling

annual audit Kraftwerk Dürnrohr

Assembling

redevelopment electrostatic filter (fild 2 and 3)

Engineering / Manufacturing / Assembling

  E-Werk Reutte

Austria, Vils-Reutte

ca. 15 km high pressure gas pipe DN200
ca. 15 km pipe laying (material: PE DA 225 bis DA 25)
150x  houseconection


Engineering / Assembling

  Fernwärme Wien
bay houseplants
Austria, Wien

warn water transferstations (until 400 kW)
heating transferstations
primary transferstations (until 2 x 1400 kW)

(about 30 to 40 stations per year)

Manufacturing / Assembling

  Fisia Babcock Germany, Mannheim, Oberhausen 1000 to electrostatic filter Mannheim
250   to electrostatic filter Oberhausen
             
Engineering / Manufacturing
Gerstl Austria, Wels

connection bridge Fachhochschule - BFI
20x2,5x3,5m (LxBxH)
additional about 27to steel construction (for soundproofing and elevators)

Engineering / Manufacturing / Assembling

  GSD
Gesellschaft für Stadt-
und Dorferneuerung
Austria, Wien elevator retrofit in buildings (city vienna)

Engineering / Manufacturing / Assembling
  Kanzler
Verfahrenstechnik
Tunis seewater-desalination
150 to steel construction

Engineering
Lafarge Perlmooser AG Austria, Retznei
















Austria, Mannersdorf

annual audit
Assembling

dissolvent plant
about 20 to steel structure
about 1000 m pipeing DN15-DN100
(material 1.4301, 1.4571, S235JR)

Manufacturing / Assembling

clinker cooler assembling
about 15 to substructure
assembling of clinker cooler (weight about 150 to)

Manufacturing / Assembling


annual audit
Assembling

assembling of hot gas duct
ø 2500 mm, Material 1.4301

Assembling

cement tank
~ 10 to  ø 4200 mm, H=16 m

Engineering / Manufacturing / Assembling

Lenzing Lyocell GmbH & Co KG

Austria, Heiligenkreuz

Linie 2
10x pressure vessel ø 1000 - 6000mm (material: 1.4571)

Engineering / Manufacturing / Assembling


8x bursting vessel (ø900mm, L=2800mm)

Engineering / Manufacturing / Assembling
MCE Energietechnik England

biodieselfuel plant Teeside 1
precast of the plant in containerdesign (about 40 containers = about 120 to) inclusive piping (about 2900m) and equipment assembling

Manufacturing / Assembling

Oestu Stettin Austria, Wien

terrorprotection
3 pieces height limiting to protect the building of the UNO

Engineering / Manufacturing / Assembling

Rote Mühle Deutschland Iran

air preheater rotor
50 to steel construction, material: COR-TEN B (S355J2G1W)
     
Manufacturing

Rudolf Austria, Purkersdorf

redevelopment of a historical platformroof
~ 100 to steel construction disassembling; redevelopment and partial substitution with new parts; assembling

Manufacturing / Assembling

Salzburg AG Austria,
Bruck-Kaprun
Gasteiner Tal


Austria, Trumersee

gas-medium pressure duct

Assembling


1800 m gaspipe DN300 PN 70
installed under way in the Trummer sea

Assembling

Tiroler Ferngas GmbH Austria, Tirol

natural gas supply
medium pressure pipe (material carbon steel)
low pressure pipe (material: PP)

Assembling

voestalpine Donawitz

Austria, Donawitz

high crane rail - free storage rail 3+4
120 to steel construction (assembling in two weeks)

Engineering / Manufacturing / Assembling

EG3 - blast furnace air-supply
steel construction, pipes (DN15 to DN1400) and a lot of dwelling work

Engineering / Manufacturing / Assembling


2 Stk. pressure vessel (waterconcept 20K)
ø 3500mm, L=8m, thickness to 15mm, material: P265GH

Engineering / Manufacturing / Assembling

pipeing BG5000 (waterconcept 20K)
(DN25 - DN1400, Material: P235TR1, S355J2G3)

Engineering / Manufacturing / Assembling

VAI Voest Alpine Industrieanlagenbau GmbH Austria, Donawitz







Germany, Dillingen





Slowika





Austria





Russia/Alchevsk
Brasil/Rio de Janeiro

84 to        piping mediapackage of panoven incl. subsurface piping
23 to        plant piping (powerplant reconstruction)
8000 m    pipes DN15 to DN400
                 (material: carbon- and stainless steel)

Engineering / Manufacturing / Assembling


piping extrusion casting plant Line3 / Line 4
20.000 m   pipes and equipment

Engineering / Assembling


2 piece cooler tank - VDK
ø 4500mm, height 20m, 58 to/piece, material: 16Mo3 and P265GH

Engineering / Manufacturing

  
125 to cooling package (sheet metall 3mm Mo3, length 12m)
  65 to steel construction and stairtower

Manufacturing


flareheads
~ 130 to manufacturing and creation of assembling drawings
               material: P265GH, 1.4828

Manufacturing

  VA-Tech Hydro Schwizerland
Cleuson-
Dixence
5 to support construction
        for pressurepipe ø 2688mm, material: S355J2G3, S355JR

Manufacturing
Waagner Biro Brückenbau AG Äthiopia




Austria, Wien

Panelbridge:
200 to steel construction

Manufacturing

truck-turn-bridge (Columbus-Center Vienna)
35 to steel construction

Manufacturing / Assembling

Weinkellerei Wegenstein Austria

pallet-delivery-bridge
45 to steel construction incl. piping of filling machine

Engineering / Manufacturing / Assembling

Wiener Linien Austria, Wien

subwaystation: U1-Station, Taubstummengasse, Praterstern
steel construction for elevators, facing- and interior work

Engineering / Manufacturing / Assembling

subwaystation: "U1-Leopoldau"
complete interior work:
12.000 m² facade facing made of sound-protection-panelen,
                  Emailpanel, Alupanel
     720 m² glas-steel-facade
     300 to  steel consupstruction

Engineering / Manufacturing / Assembling